| Commit message (Collapse) | Author | Age |
| |
|
|
|
|
| |
Exit when current vertex is adjacent to the end
|
|
|
|
| |
It's the manual last end, shame it has to be weird.
|
| |
|
|
|
|
| |
2 dimensional line intersection point
|
| |
|
|
|
|
|
|
| |
The current size isn't important, the length after prune is, and it
should be checked before adding the new link as most of the train will
still be on the previous one.
|
| |
|
| |
|
| |
|
| |
|
|
|
|
| |
Forces capture of value before outputting anything
|
| |
|
| |
|
| |
|
| |
|
| |
|
|\ |
|
| | |
|
| | |
|
| |
| |
| |
| | |
Always for working with different dimensions/types
|
| | |
|
| | |
|
| | |
|
| | |
|
| | |
|
| |
| |
| |
| | |
Still a bit arbitrary, but calculated now to scale across the required range
|
| | |
|
| | |
|
| | |
|
| | |
|
| |
| |
| |
| | |
rotation matrix
|
| | |
|
| | |
|
| | |
|
| | |
|
| |\ |
|
| | | |
|
| | |
| | |
| | |
| | | |
Albeit with the same projection
|
| | | |
|
| | | |
|
| | | |
|
| | |
| | |
| | |
| | | |
to it
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|